The Viaduct over the Ferrería Stream, completed as part of the A8 expansion, was one of ConstruGomes’ first major projects in the Picos de Europa region.
  • Year of construction: 2004
  • Location: Soto del Barco, Asturias, Spain
  • Technical solutions: Launching girders & conventional formwork
  • Total length: 848 m
  • Maximum pier height: 63 m

The project employed advanced construction methods, combining launching girders with different formwork systems, which significantly strengthened ConstruGomes’ technical capacity to operate in complex environments. At the same time, it contributed to improving regional mobility, consolidating the A8 as a strategic infrastructure linking territories in northwestern Iberia.