- Year of execution: 2008
- Location: Gernika, Spain
- Technical Solutions: Portal Falsework
- Total extension: 320,00 m
Integrated into a major road corridor, this infrastructure was designed to meet the growing demands of urban mobility, contributing to improved accessibility and the overall quality of the local road network. ConstruGomes took part in the construction of this project, applying its engineering and construction expertise to a structure that required the highest standards of quality, precision and technical excellence.





